OPERATION AND MAINTENANCE OF COAL-FIRED THERMAL POWER PLANTS

Burraq Engineering Solutions is a company that provides training in the field of Operation and maintenance of coal-fired thermal power plants. This includes regular inspections and servicing of equipment such as the boiler, turbine, and generator, as well as the Coal handling system and air pollution control equipment. They can also ensure that the equipment complies with relevant environmental regulations regarding emissions. In addition, Burraq Engineering Solutions can also provide other Trainings such as repair and overhaul of equipment and optimization of power plant performance to improve efficiency and reduce costs.

Working of Power Plants: 

Operation And Maintenance Of Coal-Fired Thermal Power Plants work by burning coal and heating water into steam, which then drives a turbine to generate electricity. The main components of a Coal-fired power plant include a coal handling system, a boiler, a steam turbine, a generator, and various auxiliary equipment such as air preheaters and soot blowers. 

The operation of the plant involves feeding coal to a boiler where it is burned to heat water for steam. The steam is then piped to a turbine which spins, drives a generator and produces electricity. The waste steam is then cooled and condensed back to the water, which is returned to the boiler where the process starts again. Maintenance of a coal-fired power plant includes regular inspections and servicing of equipment such as the boiler, turbine, and generator. 

Burraq Engineering solution provides Operation and maintenance of Coal-fired thermal Power plants Training courses in Lahore. This may include cleaning, lubrication, and replacement of worn parts. In addition, the coal handling system and air pollution control equipment will require regular maintenance. It is also important to the Operation And Maintenance Of Coal-Fired Thermal Power Plants to ensure that the equipment complies with the relevant environmental regulations regarding emissions. 

  • INTRO OF SYNCHRONIZATION AND LOAD SHARING
  • MULTIPLE GENERATORS
  • LOAD SHEDDING & LOAD MANAGEMENT
  • MULTIPLE MAINS (GRID) WITH MULTIPLE
  • GEN SETS
  •  
  • STEAM AND GAS TURBINE WITH GEN SETS
  • GEN SET ELECTRICAL SYSTEM
  • POWER SYSTEM PROTECTIONS
  • RELAYS AND SAFETIES
  • SYNCHRONIZATION OF LV &
  • MV SYSTEM
  • CONTROLLERS AND PLC PROGRAMMING
  • COMPLETE SOFTWARE TRAINING
  • & PRACTICE
  • AVR, S ECM, S, AND GOVERNOR’S STUDY
  • AVR AND GOVERNOR INTERFACING
  • PEAK LOOPING AND PEAK SHAVING
  • SWITCHGEAR DESIGN AND CALCULATIONS
  • INDUSTRIAL AND COMMERCIAL APPLICATIONS
  • REMOTE MONITORING AND SCADA
  • ALL WORLD-FAMOUS BRANDS INTRODUCTIONS
  • ENGINEERING AND DESIGN
  • HANDS-ON DESIGNS AND SLDSS,S
  • INSTALLATION AND COMMISSIONING
  • BOQ AND ESTIMATION'S
  • CASE STUDY

OPERATION AND MAINTENANCE OF COAL-FIRED THERMAL POWER PLANTS

  • Course Fee: 40,000/-
  • Duration; 2 Months
  • Timings: 9AM-11AM, 11AM-1PM, 1PM-3PM, 3PM-5PM, 5PM-7PM, 7PM-9PM     
Scroll to Top